| Ophir High Conviction Fund (OPH) ORDINARY UNITS FULLY PAID |
Financials |
$554 |
Weekly NTA 2026.06.05
|
9 Jun 2026 9:38AM |
$2.550 |
$2.490 |
fallen by
2.35%
|
|
| Cassius Mining Limited (CMD) ORDINARY FULLY PAID |
Materials |
$21 |
Notification regarding unquoted securities - CMD
|
9 Jun 2026 9:38AM |
$0.038 |
$0.028 |
fallen by
26.32%
|
|
| Lithium Plus Minerals Ltd (LPM) ORDINARY FULLY PAID |
Materials |
$19 |
Field Program to commence at Flagship Bynoe Lithium Project
|
9 Jun 2026 9:38AM |
$0.105 |
$0.120 |
risen by
14.29%
|
|
| Scorpion Minerals Limited (SCN) ORDINARY FULLY PAID |
Materials |
$14 |
Scorpion Receives $2M Right to Mine Option Fee
|
9 Jun 2026 9:38AM |
$0.028 |
$0.026 |
fallen by
7.14%
|
|
| PhosCo Ltd (PHO) ORDINARY FULLY PAID |
Materials |
$81 |
New Gasaat Discovery at KH
|
9 Jun 2026 9:37AM |
$0.175 |
$0.150 |
fallen by
14.29%
|
|
PHO - Price-sensitive ASX Announcement
Full Release
Key Points
- PhosCo Ltd has announced a new discovery at the KH prospect in its Gasaat Phosphate Project in Tunisia.
- The discovery consists of thick, shallow phosphate mineralisation intersected through a five-hole drill program.
- Drilling returned intersections ranging from 16.5m to 20.5m down-hole.
- The KH prospect is located 3.5km from the proposed plant site at Gasaat.
- This discovery follows a previous one at the DOH prospect, supporting PhosCo’s strategy for resource growth at Gasaat.
- The shallow nature of the KH mineralisation could boost the overall economics of the Gasaat project.
- The geology at KH is similar to the Gasaat area, with phosphate mineralisation classified as marine carbonate-hosted sedimentary phosphate deposits.
- The phosphate unit generally occurs as a single, continuous layer with varying thickness.
- PhosCo plans further work including additional drilling and metallurgical testing to optimize the project economics.
- A maiden Mineral Resource Estimate (MRE) for KH is planned based on assay results from recent drilling.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Viking Mines Limited (VKA) ORDINARY FULLY PAID |
Materials |
$24 |
LINKA STOCKPILE SAMPLING DELIVERS UP TO 1.1% WO3
|
9 Jun 2026 9:37AM |
$0.011 |
$0.010 |
fallen by
9.09%
|
|
VKA - Price-sensitive ASX Announcement
Full Release
Key Points
- 41 samples collected from Linka stockpile.
- Average grade of 0.4% WO3, peak up to 1.1% WO3.
- Supports strategy for future processing and offtake assessment.
- Ore sorting testwork commenced for processing enhancement.
- Ongoing metallurgical testwork and concept processing study.
- Tailings dam evaluation and surface sampling assays underway.
- Maiden drilling program preparation, first since the 1970s.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Plato Income Maximiser Limited (PL8) ORDINARY FULLY PAID |
Financials |
$1,056 |
Monthly Net Tangible Asset Backing
|
9 Jun 2026 9:37AM |
$1.385 |
$1.410 |
risen by
1.81%
|
|
| Qube Holdings Limited (QUB) ORDINARY FULLY PAID |
Industrials |
$9,117 |
Scheme Update
|
9 Jun 2026 9:36AM |
$5.000 |
$5.110 |
risen by
2.20%
|
|
QUB - Price-sensitive ASX Announcement
Full Release
Key Points
- Qube Holdings Limited has entered into a Scheme Implementation Deed with Rubik Australia Pty Limited.
- Rubik Australia Pty Limited will acquire 100% of the shares in Qube.
- The Scheme is subject to certain key conditions, including regulatory approvals.
- Qube intends to hold its General Scheme Meeting on 16 June 2026.
- A Special Dividend of $0.3465 per share is proposed, contingent on the Scheme's effectiveness.
- The total scheme consideration is $5.20 cash per Qube Share.
- Qube's Board recommends shareholders vote in favor of the Scheme.
- UniSuper, a major shareholder, will vote in a separate Scheme Meeting.
- The Independent Expert deemed the Scheme fair and reasonable for shareholders.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Swoop Holdings Limited (SWP) ORDINARY FULLY PAID |
Communication Services |
$27 |
Appointment of Non-Executive Director
|
9 Jun 2026 9:36AM |
$0.095 |
$0.088 |
fallen by
7.37%
|
|
| Zenith Minerals Limited (ZNC) ORDINARY FULLY PAID |
Materials |
$56 |
Becoming a substantial holder from FRS
|
9 Jun 2026 9:35AM |
$0.090 |
$0.089 |
fallen by
1.11%
|
|
| Forrestania Resources Limited (FRS) ORDINARY FULLY PAID |
Materials |
$603 |
Becoming a substantial holder for ZNC
|
9 Jun 2026 9:35AM |
$0.515 |
$0.380 |
fallen by
26.21%
|
|
| Clime Investment Management Ltd (CIW) ORDINARY FULLY PAID |
Financials |
$25 |
Update - Notification of buy-back - CIW
|
9 Jun 2026 9:35AM |
$0.300 |
$0.300 |
fallen by
0%
|
|
| EQ Resources Limited (EQR) ORDINARY FULLY PAID |
Materials |
$1,518 |
EQR Tenement Acquisition Supporting Mt Carbine Hub Strategy
|
9 Jun 2026 9:35AM |
$0.230 |
$0.295 |
risen by
28.26%
|
|
EQR - Price-sensitive ASX Announcement
Full Release
Key Points
- EQR entered a heads of agreement to acquire the Hodgkinson tenement package.
- The acquisition is valued at A$250,000 and includes six exploration permits.
- The acquisition supports EQR's hub-and-spoke strategy around Mt Carbine.
- The acquired tenements cover approximately 365 square kilometers.
- The acquisition is subject to regulatory and third-party approvals.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Sunshine Metals Limited (SHN) ORDINARY FULLY PAID |
Materials |
$97 |
EQR: EQR Tenement Acqstn Supporting Mt Carbine Hub Strategy
|
9 Jun 2026 9:35AM |
$0.031 |
$0.027 |
fallen by
12.90%
|
|
SHN - Price-sensitive ASX Announcement
Full Release
Key Points
- EQR acquires Hodgkinson tenement from Sunshine Metals subsidiary.
- Acquisition supports EQR's Mt Carbine Hub Strategy.
- Hodgkinson tenement spans approximately 365 km².
- Potential for additional resources near Mt Carbine.
- Acquisition cost A$250,000, subject to conditions.
- Strategic fit for regional tungsten development.
- Mt Carbine aimed to become a central processing hub.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Coast Entertainment Holdings Limited (CEH) ORDINARY FULLY PAID |
Consumer Discretionary |
$206 |
Dreamworld Precinct Development Planning Update
|
9 Jun 2026 9:35AM |
$0.420 |
$0.530 |
risen by
26.19%
|
|
| Aeris Resources Limited (AIS) ORDINARY FULLY PAID |
Materials |
$539 |
SIGNIFICANT GOLD INTERSECTIONS CONTINUE AT GOLDEN PLATEAU
|
9 Jun 2026 9:33AM |
$0.415 |
$0.360 |
fallen by
13.25%
|
|
AIS - Price-sensitive ASX Announcement
Full Release
Key Points
- Significant gold intersections have been reported from the Main, North, and East lodes at the Golden Plateau deposit.
- The drill program was expanded to approximately 14,000 meters due to initial promising results.
- Mineralisation was consistently intersected at predicted positions, validating the geological model.
- A significant high-grade intersection in hole GPS160 reinforces confidence in remnant potential.
- The Golden Plateau deposit contributed significantly to historical gold production in the Cracow goldfield.
- An updated Mineral Resource estimate is targeted for the first half of FY27 to support an economic assessment.
- Drilling aims to further define high-grade mineralisation within the Main lode and test extensions in other lodes.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Patagonia Lithium Ltd (PL3) ORDINARY FULLY PAID |
Materials |
$29 |
Trading Halt
|
9 Jun 2026 9:33AM |
$0.105 |
$0.120 |
risen by
14.29%
|
|
PL3 - Price-sensitive ASX Announcement
Full Release
Key Points
- Patagonia Lithium Ltd (ASX: PL3) has requested a trading halt.
- The trading halt is pending the release of an announcement by PL3.
- The halt is due to a planned material capital raise.
- The securities will remain halted until the announcement or until trading resumes on 11 June 2026.
- PL3 is located in Moorabbin, VIC, Australia.
- The company is involved in lithium exploration and development.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Vinyl Group Ltd (VNL) ORDINARY FULLY PAID |
Information Technology |
$76 |
Trading Halt
|
9 Jun 2026 9:32AM |
$0.060 |
$0.051 |
fallen by
15%
|
|
VNL - Price-sensitive ASX Announcement
Full Release
Key Points
- Vinyl Group Ltd (ASX: VNL) requested a trading halt.
- The halt is pending an announcement related to a proposed material acquisition and capital raising.
- The trading halt will remain until either the commencement of normal trading on 11 June 2026 or the release of the announcement.
- The request is to assist VNL in managing continuous disclosure obligations.
- The announcement is expected before the start of trading on 11 June 2026.
- There are no reasons known to VNL that the trading halt should not be granted.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Lithium Plus Minerals Ltd (LPM) ORDINARY FULLY PAID |
Materials |
$19 |
Investor Presentation
|
9 Jun 2026 9:31AM |
$0.105 |
$0.120 |
risen by
14.29%
|
|
| Horizon Oil Limited (HZN) ORDINARY FULLY PAID |
Energy |
$399 |
Third Supplementary Bidder's Statement
|
9 Jun 2026 9:31AM |
$0.220 |
$0.225 |
risen by
2.27%
|
|
HZN - Price-sensitive ASX Announcement
Full Release
Key Points
- Horizon Oil Limited has declared its offer consideration for acquiring Cue Energy Resources Limited as best and final.
- The offer includes 0.5625 Horizon Shares and A$0.008 cash per Cue Share, with no increase in consideration unless a competing proposal arises.
- As of the statement date, Horizon holds a relevant interest in 52.21% of Cue Shares.
- The offer period is set to close on 19 June 2026, at 7:00pm Sydney time, unless extended or withdrawn.
- All regulatory approval conditions have been satisfied, freeing the offer from further conditions.
- Horizon encourages Cue shareholders to accept the offer as no superior proposal has emerged.
- Horizon reiterates potential risks to Cue shareholders who do not accept the offer, particularly regarding trading liquidity if compulsory acquisition is not achieved.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Cue Energy Resources Limited (CUE) ORDINARY FULLY PAID |
Energy |
$74 |
HZN: Third Supplementary Bidder's Statement
|
9 Jun 2026 9:31AM |
$0.145 |
$0.105 |
fallen by
27.59%
|
|
CUE - Price-sensitive ASX Announcement
Full Release
Key Points
- Horizon Oil Limited has declared its offer consideration for Cue Energy Resources Limited as best and final.
- Horizon currently holds 52.21% of Cue's shares, surpassing the minimum acceptance condition.
- The offer includes 0.5625 Horizon shares and A$0.008 cash per Cue share.
- The offer is free from all regulatory approval conditions and is scheduled to close on 19 June 2026.
- No superior proposal has emerged for Cue.
- Horizon encourages Cue shareholders to accept the offer to avoid potential liquidity risks.
- The document is a third supplementary bidder's statement in relation to Horizon's takeover bid.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Astron Corporation Limited (ATR) ORDINARY FULLY PAID |
Materials |
$249 |
RL2002 Ore Reserve Update & Revised Phase 2 Economics Study
|
9 Jun 2026 9:31AM |
$0.550 |
$0.580 |
risen by
5.45%
|
|
ATR - Price-sensitive ASX Announcement
Full Release
Key Points
- Phase 2 RES indicates a pre-tax NPV8 of $1.5 billion.
- Combined NPV8 of $2.3 billion for Phases 1 and 2.
- Phase 2 involves a duplication of Phase 1 operations on RL2002.
- Incremental capital cost for Phase 2 is estimated at $557 million.
- Construction of Phase 2 expected to start in Q1 2031.
- Phase 2 production to average 14.4Ktpa of REE Concentrate and 376Ktpa of Heavy Mineral Concentrate.
- Ore Reserve estimate for RL2002 indicates 435Mt at 4.7% heavy mineral grade.
- Project aims to become a significant producer of zirconium, titanium, and rare earth elements.
- Astron's joint venture partner is Energy Fuels Inc., a U.S.-based company.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Rimfire Pacific Mining Limited (RIM) ORDINARY FULLY PAID |
Materials |
$33 |
Rimfire to secure 60% of Avondale Project
|
9 Jun 2026 9:29AM |
$0.010 |
$0.012 |
risen by
20%
|
|
RIM - Price-sensitive ASX Announcement
Full Release
Key Points
- Rimfire to secure 60% interest in Avondale Project
- Golden Plains Resources vests 40% interest under Avondale Earn In Agreement
- Avondale located near major scandium deposits by Rio Tinto and Sunrise Energy Metals
- Includes Melrose, Currajong, and Murga scandium deposits
- Establishment of unincorporated joint venture with Rimfire as manager
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Chariot Resources Ltd (CC9) ORDINARY FULLY PAID |
Materials |
$13 |
Chariot Expands Resurgent Lithium Project
|
9 Jun 2026 9:28AM |
$0.056 |
$0.057 |
risen by
1.79%
|
|
CC9 - Price-sensitive ASX Announcement
Full Release
Key Points
- Chariot Resources staked 573 new claims at Resurgent East.
- FMS Lithium Corporation, a subsidiary, manages the project.
- The total claims now stand at 1,170, up from 597.
- The expansion is due to recovering lithium prices.
- Position strengthened against Lithium Americas' Thacker Pass.
- Pending county and BLM filings for new claims.
- Chariot holds a 79.4% interest in FMS.
- Permitting is ongoing for an initial drilling program.
IMPORTANT NOTE: This information is autogenerated and has not been reviewed for accuracy or completeness. You should
refer to the full announcement here for further information.
| Articore Group Limited (ATG) ORDINARY FULLY PAID |
Consumer Discretionary |
$85 |
Change of Director's Interest Notice - Naseema Sparks
|
9 Jun 2026 9:28AM |
$0.250 |
$0.290 |
risen by
16%
|
|